Downstreamthe daily issueevery agency

Federal Energy Regulatory Commission

295 documents across 45 days of the archive, 0 of them final rules. The five most recent days are below.

Dates this agency has set that have not yet arrived

What is in this list

Comment deadlines and effective dates from anything this agency published in the archive, still ahead of 19 October 2026.

Dates set before this archive began are not here, and their absence is not evidence that none exist.

as_of

  1. today Comments close Commission Information Collection Activities (Ferc-521); Comment Request; Extension Energy Department · Federal Energy Regulatory Commission
  2. +7d Comments close Commission Information Collection Activities (FERC-725S); Comment Request Energy Department · Federal Energy Regulatory Commission
  3. +11d Comments close Commission Information Collection Activities (FERC-FERC-510); Comment Request; Extension Energy Department · Federal Energy Regulatory Commission
  4. +17d Comments close Commission Information Collection Activities (FERC-603); Comment Request; Extension Energy Department · Federal Energy Regulatory Commission
  5. +28d Comments close Commission Information Collection Activities (FERC-725A, 725L, and 725Z); Comment Request; Revision Energy Department · Federal Energy Regulatory Commission
  6. +56d Comments close Commission Information Collection Activities (FERC-725B); Comment Request; Extension Energy Department · Federal Energy Regulatory Commission

19 October 2026 7 documents

Machine-written from the fields above · claude-haiku-4-5-20251001

The Federal Energy Regulatory Commission published seven notices including filings, water quality certification application periods, and comment period notices.

Post on X Post on LinkedIn Permalink

16 October 2026 3 documents

Machine-written from the fields above · claude-haiku-4-5-20251001

The Federal Energy Regulatory Commission published notices regarding the proposed Texas Gateway Project and combined filings.

Post on X Post on LinkedIn Permalink

15 October 2026 5 documents

Machine-written from the fields above · claude-haiku-4-5-20251001

The Federal Energy Regulatory Commission published five notices, including requests under blanket authorization, an information collection comment request, and an environmental assessment availability notice.

Post on X Post on LinkedIn Permalink

NoticeEnergy DepartmentFederal Energy Regulatory Commission

Commission Information Collection Activities (FERC-725A, 725L, and 725Z); Comment Request; Revision

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on three currently approved information collections, Mandatory Reliability Standards within Interconnection Reliability Operations and Coordination (IRO); (1) FERC-725Z (OMB#1902-0276) (RD26-1-000) _IRO-010-6 Reliability Coordinator Data and information Specification and Collection, Modeling, Data, and Analysis (MOD); (2) FERC-725L (OMB#1902-0261) (RD26-2-000)_MOD-032-2_MOD-033-3_MOD-026-2 Data for Power System Modeling and Analysis, Bulk-Power System Transmission Operations (TOP); (3) FERC-725A (OMB#1902-0244) (RD26-3-000)_TOP-003-8 Transmission Operator and Balancing Authority Data and Information Specification and Collection. There are anticipated changes in the reporting requirements for this information collection for each of the eight standards. This order was published for 60-day notice period on December 18, 2025, and received no comments.

  • Comments close in 28 days

91 FR 65538FR Doc. 2026-21074official PDFfederalregister.gov

14 October 2026 6 documents

Machine-written from the fields above · claude-haiku-4-5-20251001

The Federal Energy Regulatory Commission published six notices, including environmental assessments, a license termination, and combined filing notices.

Post on X Post on LinkedIn Permalink

13 October 2026 6 documents

Machine-written from the fields above · claude-haiku-4-5-20251001

The Federal Energy Regulatory Commission published six notices including declarations of intention for hydroelectric projects and a comment request on reliability standards.

Post on X Post on LinkedIn Permalink

NoticeEnergy DepartmentFederal Energy Regulatory Commission

Commission Information Collection Activities (FERC-725B); Comment Request; Extension

In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725B (1902-0248), Mandatory Reliability Standards, Critical Infrastructure Protection (CIP)--Update to CIP-015. This update changes the CIP-015-1 standard to CIP-015-2 which reflects the changes implemented through Order RD26-6- 000 issued on August 10, 2026.

  • Comments close in 56 days

91 FR 64921FR Doc. 2026-20880official PDFfederalregister.gov

Earlier

40 further days of this agency's activity are in the long-form archive, oldest to newest, on one page.

Everything Federal Energy Regulatory Commission has published, 2026-08-10 to 2026-10-19 →

Ask an assistant instead

Everything on this page is also a tool call. Add mcp.downstream.sh as an MCP server in Claude, ChatGPT, or any client that speaks the protocol — no key, no account — then paste this:

Using the Downstream MCP server at mcp.downstream.sh, call whats_new_since with agency "Federal Energy Regulatory Commission" since 2026-10-13, then summarise what changed and list every deadline it created.

Reaches whats_new_since. The response carries its own citations and states what it is missing — including which dates it has no record for.